Requirements Problems
- In order to be evaluated, requirements must be observable, measurable, and as objective as possible
- Invalid requirements can cause many problems in system design and in V&V.
- Here are some examples of invalid requirements:
- – Lightweight
- – Must be better than current system
- – 100% reliability
- – No false alarms
- – Must use proven technology
- Why are they invalid?
Why Invalid?
- Lightweight – not specific enough.
- Must be better than current system – ambiguous; How much better? In what characteristic? What is the current system?
- 100% reliability – unrealistic, impossible to meet
- No false alarms – unrealistic
- Must be proven technology – ambiguous
???? Das ist wohl für Insider!? Geht es Euch gut? Xs